Leads high-level planning work sessions for program plan and schedule development.
领导针对计划和进度开发的高层计划工作会议。
An estimate is a key element of the project plan and schedule, and the consequences of poor estimating are failed projects.
评估是项目计划和安排的一个重要组成部分,评估不当的结果就是项目失败。
The problem with most people is not that we don't have enough time but rather how we plan and schedule our time.
对大多数人而言,问题并不在于没有足够的时间,而是不知道如何规划和安排时间。
The Contractor shall prepare a detailed test plan and schedule.
承包商应准备一份详细的试验方案与时间进度表。
To help ensure your order is shipped on time, please contact BVCPS to plan and schedule your inspections.
为确保您的订单能及时装运,请联系BVCPS为您计划和安排检验。
The fourth chapter gives the plan of BL company's purchasing and supply chain management, including management process, plan and schedule, etc.
第四部分是BL公司进行新的采购与供应链管理的实施计划,包括实施范围、管理程序、实施计划和时间安排等。
The results indicate that the simulation model can help project manager to prepare his risk management plan and schedule plan effectively and efficiently.
结果显示,该模型能够帮助项目经理制定风险管理计划和合理的进度计划。
The third level is supporting technology level, involving product design facing reverse logistics, product track management, production plan and schedule of remanufacturing.
第三层是支撑技术层,主要包括面向逆向物流的产品设计、产品跟踪管理、再制造生产计划和调度。
Plan and schedule personnel and equipment for maximum efficiency.
最大效率地计划、安排人员及设备。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
应用推荐