The characteristics of negative skin friction (NSF) with working load on pile top were analyzed.
分析了在桩顶荷载作用下的负摩阻力特性。
The settlement of pile top in pile foundationconsists of pile compression and settlement of substratum.
采用实体深基础法的思想,桩顶沉降分为桩身压缩和桩端沉降。
The accumulative total displacements at the measuring points on the base top and pile top are somewhat high.
基坑西侧支护体系的基顶和桩顶测点累计位移偏大。
The result shows that local settlement and pile top force are mainly controlled by the local load's density.
通过分析计算结果总结变化规律,发现荷载密度对此类基础的局部沉降、桩顶反力影响较大。
During tunneling, there are back and forth displacements at pile top along the direction in which the tunnel is pushed forward.
开挖过程中桩顶出现沿隧道推进方向的往复位移;
The vertical load did not help to reduce the lateral displacement at the pile top anymore when it was applied after the lateral load.
先施加水平荷载再施加竖向荷载时,竖向荷载不再起到减小水平荷载作用下桩顶侧移的作用。
It was shown that computed bending moments along pile shaft and deflection occurred at pile top are consistent with the measured ones.
桩身弯矩和桩顶位移的计算值与实测值基本符合。
A solution to the torsional response of a multi defective pile in layered soil is presented, when subjected to an impact torque at pile top.
给出层状土中多缺陷桩在桩顶冲击扭矩作用下桩顶扭转响应的解。
Monitoring results show that the axial stresses and displacement of pile top can satisfy requirements, and the supporting structure is safe.
结果表明,锚杆轴力和桩顶位移满足要求,支护结构安全。
On the basis of in-situ survey data, the displacement of anti-slide pile top is predicted using the gray prediction theories of GM (1,1) model.
以现场实测资料为依据,将GM(1,1)灰色预测理论应用于桩顶位移预测。
The analysis of a crane load example shows that the pile deformation, especially the pile top rotation, greatly influence the frame lateral displacement.
通过对某工程实例吊车荷载作用下排架侧向位移的计算,证明桩的变形对排架侧向位移影响较大,尤其桩顶转角的影响大。
Calculation method of foundation pressure of rigid foundation is used to calculate the change of vertical force on pile top induced by the error of a pile position.
将刚性基础基底反力的计算方法用于桩位偏差时各桩顶竖向力的计算。
When the load on pile top is small, the later friction undertake mainly the load. With the increase of load on pile top, the resistance of pile tip develops gradually.
桩端力发挥的程度与桩顶荷载的大小相关,桩顶压力较小时,桩顶荷载主要由桩侧摩阻力承担,随桩顶压力的增大,桩端力将逐渐发挥。
In this method, the static resistance at pile toe can be calculated directly with the rebound at pile top and impulse duration from the acceleration signal at pile top.
在该公式中,桩端土的静阻力可以直接从桩顶的加速度信号中获得的桩顶回弹和冲击力持续时间计算得到,并且计算结果和土阻尼无关。
Therefore, it is feasible to analyze the bearing capacity of a large diameter single pile by three parameters load transfer function model of pile body and pile top and numerical iteration method.
说明文章提出的方法对计算大直径单桩的荷载与沉降曲线具有较好的适用性,利用桩身和桩端的三参数荷载传递函数模型和迭代算法分析大直径单桩的承载性状是可行的。
Pile top deviation due to piling and excavation on saturated soft soil foundation is usually an engineering disease.
在饱和软粘土地基上打桩挖土造成桩顶偏移的情况,是累见不鲜的工程病害。
Pile top deviation due to piling and excavation on saturated soft soil foundation is usually an engineering disease.
在饱和软粘土地基上打桩挖土造成桩顶偏移的情况,是累见不鲜的工程病害。
应用推荐