• This paper introduces a kind of the check method for the building pile position after coordinate survey layout.

    介绍了建筑物工程桩位坐标测量放线后检查验线的一种方法。

    youdao

  • Construction should be fully prepared, the construction section of the pile position to find accurate. Lofting should be accurate, the error in the specified range.

    施工准备应充分,施工路段桩号位置找准确。放样应精确,误差在规定范围内。

    youdao

  • Calculation method of foundation pressure of rigid foundation is used to calculate the change of vertical force on pile top induced by the error of a pile position.

    将刚性基础基底反力的计算方法用于桩位偏差时各桩顶竖向力的计算。

    youdao

  • Calculation method of foundation pressure of rigid foundation is used to calculate the change of vertical force on pile top induced by the error of a pile position.

    将刚性基础基底反力的计算方法用于桩位偏差时各桩顶竖向力的计算。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定