Hand-over test includes quality of software and hardware and maintainability.
交接测试工作包括硬件、软件的质量和可维修性。
The Substation Electrical Testing Coach(EST-C1) is used for high voltage electrical equipment in substation or feeder station's preventive test and project's handing over test.
C1变电站电气试验车适用于电力变电站及电气化铁路牵引变电所的电力设备的工程交接试验及预防性试验。
This paper describes briefly the principle and method of GPS - supported bundle blockadjustmet. Some experiment results of an actual flight over test field Taiyuan are discussed.
本文简要介绍了GPS辅助光束法区域网平差的基本原理和方法,详细讨论了太原航摄机动态试验场实际GPS航摄飞行试验的结果。
Items of the tests are following: control test with the bypass valve, control test with the major feedwater valve and change-over test between bypass valve and major feedwater valve.
试验项目包括旁通阀控制试验、主给水阀控制试验和旁通阀与主给水阀的切换试验。
Items of the tests are following: control test with the bypass valve, control test with the major feedwater valve and change-over test between bypass valve and major feedwater valve.
试验项目包括旁通阀控制试验、主给水阀控制试验和旁通阀与主给水阀的切换试验。