它沉积于近海平台的低能海侵环境中。
It was deposited in a lower energy environment of transgression in the sublittoral platform.
近海机动卸载平台的设计方案可以通过风险评估。
The plan of the mobile offshore platform is passed in the Risk Estimate.
近海机动卸载平台的设计方案可以通过风险评估。
The plan of the mobile offshore platform is passed in the Risk Estimate.
应用推荐