图4:RUP步骤定义评价任务。
图7:RUP步骤“测试和评价”
结果制成便于床位工作评价的质控图。
Results The quality control chart was made for estimating sickbed work.
利用眼图对传输系统的性能进行了评价。
The transmission system function is evaluated by eye diagram.
概念图的学习分为概念图的绘制、应用和评价三个阶段。
The study of concept chart is composed of three stages: drawing, application, and assessment.
概念图的学习分为概念图的绘制、应用和评价三个阶段。
The study of concept chart is composed of three stages: drawing, application, and assessment.
应用推荐