• 复杂采用建立方法进行清测径

    Complex pipe can be established by the method of back pressure pigging, caliper.

    youdao

  • 壳式换热器重要也是最复杂部件

    Tubesheet is the most important and complicated part of tube-and-shell heat exchanger.

    youdao

  • 并且证明悬料区的可以近似等于降。

    The total pressure drop in hung-up regime is approximately equal to that in the standpipe.

    youdao

  • 壳式换热器重要也是最复杂部件

    Tubesheet is the most important and complicated part of shell-and-tube heat exchanger.

    youdao

  • 排水上部下部都存在和负

    Positive and negative pressure existed in the upper and lower drainage pipes.

    youdao

  • 波纹四氟材料制作的,容易导致波纹破裂

    PTFE material for corrugated pipe is made, pressure, pressure large, easily lead to broken bellows.

    youdao

  • 波纹四氟材料制作的,容易导致波纹破裂

    PTFE material for corrugated pipe is made, pressure, pressure large, easily lead to broken bellows.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定