水力发电厂转型期相关生存环境剖析与研究。
Study on Existing Environment of Hydropower Station during System Reform Period.
某水力发电厂已建主厂房为钢筋混凝土框架结构。
The main building of a power plant was the reinforced concrete frame building.
我们可以建立良好的风力或水力发电厂,这样的机器。
One could build a fine wind or hydro plant with such a machine.
我们可以建立良好的风力或水力发电厂,这样的机器。
One could build a fine wind or hydro plant with such a machine.
应用推荐