发起人提出了成本和进度计划要求。
认识到成本和进度管理是无法分割的。
Recognize that cost and schedule management are inseparable.
负责项目成本和进度控制。
没有完成风险管理之前,项目成本和进度无法最终确定。
Project cost and schedule cannot be finalized without completing risk management.
举例来说,一家保险公司最近经历了不可接受的成本和进度的超出。
For example, an insurance company recently was experiencing unacceptable cost and schedule overruns.
例如,一个被提议的进度变更常会影响成本,风险,质量和人员构成。
For example, a proposed schedule change will often affect cost, risk, quality, and staffing.
采用后可以提高质量、进度和成本绩效。
Its use can result in improved quality, schedule and cost performance.
在保证工程质量的前提下,如何进行进度和成本管理是项目管理的关键。
On the basis of quality, how to carry out progress and cost management is the key of project management .
进度、成本和质量是工程项目管理的三大控制目标。
Time, cost and quality are the most important control objects of project management.
确定和控制产值、成本这两项工作都在工程的进度中。
Determining production and cost, and controlling both during the progress of the work.
这类项目的物料管理会直接影响项目成本和工程进度。
The management to these materials will affect directly project cost and process.
项目管理的主要控制要素是质量、进度和成本。
The major control elements for a project management should be its quality, schedule and costs.
这可以在两个进度和成本方面。
这可以在两个进度和成本方面。
应用推荐