负责工程变更的执行与跟踪;
Responsible for implement and track the process engineer change issues.
建设项目建设过程中,常会发生工程变更。
In the construction process, engineering changes often occur.
新产品和工程变更的评估及相应措施的实施。
New product and ECN evaluation and relevant solution implement.
产品工程变更。
继而提出加强公路建设项目工程变更管理的控制策略。
And then strengthening the management of road construction projects engineering change control strategy is proposed.
笔者根据几项工程变更索赔经验对索赔理由进行探讨。
According to the several engineering change claim to claim experience is discussed in this paper.
负责工程变更编号的发放与管理,工程变更的状态跟踪及文件存档;
Engineering change management. To register EC No. , track status and record the document.
若施工期间出现工程变更,则工程变更通知单要符合合同中的单价比率规定。
If there is a change order during the construction period, the change order shall adopt the unit rate price of the contract.
作为一个小组,版本工程学在变更管理领域具备丰富的经验。
As a group, Release Engineering has tremendous experience in the area of Change Management.
将版本工程学团队打造为变更管理处理过程的监护人。
Make the Release Engineering team the clear keepers of the change management process.
对于简单的合并,变更控制工程师可以自己一个人搞定。
For simple merges the change control engineer can generally handle it on his own.
必须批准所有工程预算变更,时间表或需求变更。
He has to approve all changes of engineering budget, schedule or requirements.
工程业主应尽量减少设计变更,以避免索赔和纠纷;
The employer should reduce the amount of design change to avoid claim and argument.
设计变更是造成工程概算突破的重要环节。
Design alterations are an important link to occasion the breakthrough in construction estimate.
没有工程师的指示承包商不得作任何变更。
The Contractor shall not make any such variation without an instruction of the Engineer.
将自适用性的理念引入软件工程领域,以期缓解业务变更频繁带来的设计矛盾。
The article introduces the idea of self-applicability into software design to account for the problem.
将自适用性的理念引入软件工程领域,以期缓解业务变更频繁带来的设计矛盾。
The article introduces the idea of self-applicability into software design to account for the problem.
应用推荐