• 切换执行故障转移测试一部分

    Cutover is executed just like the first part of a failover test.

    youdao

  • 编译ltp测试套件安装然后切换dsf目录

    Build the LTP test suite and install it, and then change into the DSF directory.

    youdao

  • 切换Events选项卡输入测试数据然后Continue40)。

    Switch back to the Events tab, enter test data, then press Continue (Figure 40).

    youdao

  • 切换PerformanceTest视角打开一个测试日志

    Switch to the Performance Test perspective and open a test log.

    youdao

  • 保存更改切换Diagram视图运行一个快速测试

    Save the changes and switch back to the Diagram view to run a quick test.

    youdao

  • 可以通过ha4机器杀死名为 Loadl_negotiator 的中央管理进程测试失效切换

    You can test failover by killing the central manager process called Loadl_negotiator on the ha4 machine.

    youdao

  • 测试调度机器失效切换

    Test scheduling machine failover

    youdao

  • 切换TestScript部分点击“+”符号(添加已存在测试脚本)。

    Navigate to the test script section and click the "+" symbol (Add existing test scripts).

    youdao

  • 开始测试切换机器任意随机目录

    To begin, change to any random directory on your machine.

    youdao

  • 测试中央管理器机器失效切换

    Test failover of the central manager machine.

    youdao

  • 测试定义决定系统配置切换需求

    The test definition will determine the system configuration and switching needs.

    youdao

  • 显而易见正确地选择切换时机实现单机测试关键

    Obviously, to choose shifting time accurately is a key to realize single machine test.

    youdao

  • AKB测试切换测试位置

    Set "AKB" test switch to test position.

    youdao

  • AKB测试切换测试位置

    Set "AKB" test switch to test position.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定