对公和桥拉索的索力和倾角进行了垂度修正计算。
The modified calculation about cable's Angle and force of Gonghe bridge is done.
并对收缩段水头损失的计算公式进行修正。
The formula to calculating head losses in the contraction section were revised.
对二级减速器BP网络模型进行了结构修正与优化计算。
The structure revise and optimization calculation has been made to secondary decelerator BP network.
通过计算机模拟,得到迭代修正后精确的近场值。
By computer simulation, a fairly accurate correction value can be obtained.
在设计计算上,对传统的计算方法做了修正。
引入了横截面形状修正因子,简化了公式的表达和计算。
And a shape factor is introduced into the expression, which simplifies the theoretical expression.
折现资本成本采用“修正的资本资产定价”模型计算。
For the "discount rate" in the model, we use the "CAPM" model to confirm it.
本研究对RESCON模型中输沙率的计算公式进行了修正。
This study amends the formula of sand transport rate in RESCON model.
本研究对RESCON模型中输沙率的计算公式进行了修正。
This study amends the formula of sand transport rate in RESCON model.
应用推荐