第一类问题为模糊柔性作业车间调度问题。
The first problem is the fuzzy flexible job shop scheduling problem.
在该研究领域里,它属于非标准型的的作业车间调度问题。
In this research field, it is a none-standard Job Shop Scheduling Problem.
第二类问题为具有预防性维修的模糊柔性作业车间调度问题。
The second problem is the fuzzy flexible job shop scheduling problem with preventive maintenance.
主要作业表和车间控制是怎么完成的?
How is master scheduling and shop floor control accomplished?
车间作业调度系统具有很强的产品和工艺关联性。
Workshop task scheduling system has strong relationship between production and technics.
车间作业计划是解决这一难点的有效措施之一。
Job shop scheduling is one of the effective measures to resolve the problem.
车间作业调度是典型的NP难题。
车间作业调度是典型的NP难题。
应用推荐