Don't test the depth of the water with the both feet!
不要两脚一起试水深!
It can also supply a list of certified LABS to test the water for you.
它也可以提供经认证的实验室名单,以测试你的水。
Do several partial water changes and test for Nitrites.
局部换水,并测试亚硝酸含量。
Water test of all boiler water.
锅炉水质检测。
Flexibility and hosing test for small watertight hatch cover (water tight door and window).
水密小舱口盖(水密门、窗)启闭灵活性、冲水检查。
The water should be let out if the trail run will not be done at once after pressure test.
如压力测试后如不立即试运行冷却器,应将冷却器的水排干(见第5项停用)。
Test pool's water temperature before you plunge in.
在你跳入之前你应该测试水温。
Please dive in first and test the temperature of the water.
先把手插在水里试试水温。
Flexibility and hosing test for small water tight hatch cover(water tight door and window).
水密小舱口盖(水密门、窗)启闭灵活性、冲水检查。
Repeat the leak test in the water bath.
在水槽中重复泄漏测试。
How do you test the temperature of the baby's bath water?
你该如何测试宝宝洗澡水的温度?。
To test system functions, please open the valves and drain water out of them.
开启阀门排水来检验系统功能。
The water temperature layering simulation test can achieve obvious benefits.
进行水温分层模拟试验,收益效果明显。
What's to be done after water pressure test? Acid flushing or galvanizing?
水压试验后怎么处理,是酸洗还是镀锌?
Test media is simulated seawater, ie. add 11.62kg sea salt in 0.33cu. m. fresh water (weight ratio 3.52%).
试验的介质为模拟海水,即在0.33立方米的淡水中添加了11.62kg的海盐,海盐与淡水的重量比为3.52%。
Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).
No1压载水舱(No.15分段)气压试验(压头试验)检查。
Laboratory fill test: fill water content, grain analysis and specific gravity test were tested.
填土的室内试验:填土含水量测定、颗粒分析和比重测定。
The test fluids were pure water and R-11.
实验工质使用了水和R - 11两种液体。
He added a small amount of water into the test tube.
他往试管中加入了少量的水。
And microwave method is a good method to test its water content.
微波法是测定其含水量的较好方法。
The high quality mineral water has passed the state - level test.
优质矿泉水已通过国家级鉴定。
Pure water is taken as blank reagent (control) based on the result of GC-MS test;
根据GC-MS测定分析的结果,决定选纯净水作为本文实验的空白试剂。
Design and test electrical equipment and automation control in water-treatment system.
负责水处理系统中电气及自动化控制设备的设计和调试。
Fill system with Dl water and perform leak test with circulation pump.
向系统中填充去离子水并用循环泵测漏。
Would you test the heat of the water before I bathe the baby?
我给婴儿洗澡前请你试一下水温好吗?。
Would you test the heat of the water before I bathe the baby?
我给婴儿洗澡前请你试一下水温好吗?。
应用推荐