Pine Valley pay system developed implementation details.
制定华彬庄园薪酬体系实施细则。
On this basis, a system dynamic model of peak and valley time price is established.
在此基础上,建立了峰谷分时电价系统动力学模型。
Studied area of ground water system is usually a ralaction integrated valley of ground water.
地下水系所研究的范围通常是一个相对完整的地下水流域。
Studied area of ground water system is usually a ralaction integrated valley of ground water.
地下水系所研究的范围通常是一个相对完整的地下水流域。
应用推荐