I used to crane my neck as we passed that turn.
当我们打拐角那儿经过时,我总要伸长着脖子。
A crane had to be used to haul the car out of the stream.
不得不用了一台起重机把轿车从河里拉出来。
Do you want to visit Yellow Crane tower.
你想去黄鹤楼看看吗?
The crane now tried to drag the moon down out of its orbit.
起重机现在正拼命将月亮拖离它的轨道。
Another thing to keep in mind is the history of beekeeping (Crane). Honeybees are.
另一个要记得的是养蜂历史。
The band hired a crane to lift the piano into the theatre.
乐队组用上台起重机把钢琴搬进剧场。
Thee band hired a crane to lift the piano into the theatre.
乐队组用上台起重机把钢琴搬进剧场。
Wow, we cannot even build the bridge here, or the crane to assemble it.
哇,我们甚至不会造桥了,或者造桥的吊车。
Hence, it has significant actual sense to analysis the malfunction of crane.
因此,对起重机故障的分析有着重要的实际意义。
We used a crane to lift the huge box into the backyard.
我们使用起重机将这个大箱子搬进了后院。
We used a crane to lift the huge box into the backyard .
我们使用起重机将这个大箱子搬进了后院。
There is a crane to achieve agreement.
其中有一个起重机的协议实现。
To evaluate the fatigue life of tower crane, research the load status of tower crane.
目的研究塔式起重机工程载荷状态,提供评估塔式起重机疲劳寿命的依据。
My suggestion is that you should use a floating crane to lift the two equipments.
我的建议是你们应当用浮吊来搬这两台设备。
Synopsis Biting rail is a common failure due to improper operation for the bridge crane.
在桥式起重机使用中常因使用不当出现车轮的啃轨现象。
Eric is first to reach but finds Crane dead.
他是第一个达到但发现起重机死。
With these words he threw the crane to the side.
他一面说着,一面把仙鹤扔到一边。
Aiming to the crane load (Q) importance in control single story mill building design.
针对吊车起重量(Q)在控制单层工业厂房设计中的重要性。
At last the crane agreed to try.
最后一只鹤同意尝试一下。
The crane put the car on to the ship.
起重机把汽车吊到轮船上。
There is no better plan, Paul began to pay attention to the fate of crane time.
没有更好的打算,保罗开始注意起重机的命运时刻。
There is no better plan, Paul began to pay attention to the fate of crane time.
没有更好的打算,保罗开始注意起重机的命运时刻。
应用推荐