A test load was applied to the girder.
一个试验载荷作用于该梁上。
For test agents, the CPU speed and memory available will limit the test load.
对测试代理程序而言,CPU速度和可用的记忆体将会限制测试负载。
Bring the updated target subset back online (preferably test with some test load).
使已更新的目标子集重新联机(使用一些测试负载进行了完美测试后)。
Your course load is set, your grades are set, your test scores are set.
你的课程负荷已经确定了,你的分数已经确定了,你的考试成绩也已经确定了。
This should load the project in the Functional Test Projects view.
这样就在功能测试项目视图中加载了项目。
We conducted each load test twice to determine whether the same results would occur.
我们执行每个负载测试两次,以确定是否会发生相同的结果。
Figure 7 shows a system under load and the garbage collection results during the test.
图7显示了测试期间,在负载和垃圾收集情况下的系统的结果。
Notice that the load test clients are not residing on the application servers themselves.
请注意负载测试客户机没有驻留在应用程序服务器上。
With all the tables defined in the test database, you can now load test data.
在测试数据库中定义了所有表之后,现在可以装载测试数据。
This was caused by the way in which the custom load test tool was created.
这是由于自定义负载测试工具创建的方式所导致的。
Time: Total time of the load test run.
时间:负载测试运行的总时间。
Before continuing with the scenario, you should load and test the initial artifacts.
在继续该场景之前,您应该加载和测试初始构件。
An improved load test tool was created to address these issues.
第二个负载测试工具经过改进来处理这些问题。
Create a test harness and load test your database.
创建一个测试用具,对数据库进行负载测试。
This statement will load the Test: : Unit module.
这个语句将装载test:Unit模块。
Load the test file CustomerOrder2.xml, as shown below.
载入测试文件CustomerOrder2 . xml,如下所示。
Use DB2 LOAD task assistant to load the data to the test database
使用DB2LOAD任务助手将数据加载到测试数据库
The first test times the load-up for the example login-screen application.
第一个测试将测试示例登录应用程序的装载时间。
It's important to do the browser test and, if required, load the appropriate document.
对浏览器进行测试很重要,如果必要的话,还要装入合适的文档。
Service Test Control Point Load and stress testing.
服务测试控制点 –负载测试和压力测试。
I should say the load test of the generator is satisfactory.
我应该说发电机的负载试验是满意的。
Below are the test results using the second Remote Management Agent load test tool.
以下是使用第二个RemoteManagementAgent负载测试工具所得到的结果。
The cutting accuracy check is also carried out after the load test.
切削精度检查亦放在负荷试验后进行。
This article also suggested that detailed operation process of load rejection test and RB test.
提出了机组甩负荷试验和RB试验中锅炉侧的具体操作过程、要点等。
Load and performance test for main generator (emergency generator).
主发电机(应急发电机)负荷及特性试验。
Load rejection method is a new test method.
抛栽法测参数是一种新的试验方法。
Test by minimum Vin and constant resistor load.
测试的最低输入电压和恒定电阻负载。
Test by minimum Vin and constant resistive load.
测试的最低输入电压和恒定电阻负载。
Load test for shaft generator and function test on sea trial.
轴带发电机负荷测验和航行时效用测验。
You can then load the new mission and test it.
你可以加载新任务并测试它。
应用推荐