Flow shop scheduling problems.
流水作业排序问题。
Job shop scheduling is a typical NP problem.
车间作业调度是典型的NP难题。
The first problem is the fuzzy flexible job shop scheduling problem.
第一类问题为模糊柔性作业车间调度问题。
In this research field, it is a none-standard Job Shop Scheduling Problem.
在该研究领域里,它属于非标准型的的作业车间调度问题。
Job shop scheduling is one of the effective measures to resolve the problem.
车间作业计划是解决这一难点的有效措施之一。
Then, found its application in flow shop scheduling problems with two objects.
并应用该算法解决了双目标的流水车间调度问题。
The dramatic characteristic of the job shop scheduling problem is its complexity.
车间调度问题的突出特点是其复杂性。
The second problem is the fuzzy flexible job shop scheduling problem with preventive maintenance.
第二类问题为具有预防性维修的模糊柔性作业车间调度问题。
How is master scheduling and shop floor control accomplished?
主要作业表和车间控制是怎么完成的?
Bottleneck machine is a key factor in shop floor production and scheduling.
瓶颈机床是影响车间生产和调度的关键因素。
Bottleneck machine is a key factor in shop floor production and scheduling.
瓶颈机床是影响车间生产和调度的关键因素。