• Flow shop scheduling problems.

    流水作业排序问题

    youdao

  • Job shop scheduling is a typical NP problem.

    车间作业调度典型NP难题

    youdao

  • The first problem is the fuzzy flexible job shop scheduling problem.

    一类问题模糊柔性作业车间调度问题。

    youdao

  • In this research field, it is a none-standard Job Shop Scheduling Problem.

    研究领域里,属于标准型的的作业车间调度问题。

    youdao

  • Job shop scheduling is one of the effective measures to resolve the problem.

    车间作业计划解决难点有效措施之一。

    youdao

  • Then, found its application in flow shop scheduling problems with two objects.

    应用算法解决了双目标的流水车间调度问题

    youdao

  • The dramatic characteristic of the job shop scheduling problem is its complexity.

    车间调度问题突出特点复杂性

    youdao

  • The second problem is the fuzzy flexible job shop scheduling problem with preventive maintenance.

    二类问题具有预防性维修模糊柔性作业车间调度问题。

    youdao

  • How is master scheduling and shop floor control accomplished?

    主要作业表车间控制怎么完成的?

    youdao

  • Bottleneck machine is a key factor in shop floor production and scheduling.

    瓶颈机床影响车间生产调度关键因素。

    youdao

  • Bottleneck machine is a key factor in shop floor production and scheduling.

    瓶颈机床影响车间生产调度关键因素。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定