Transport speed is set by the operator or determined by rolling schedule.
运输速度由于那些操作者肯定或者被以滚时间表肯定。
The automation would decrease driver's fatigue and speed up construction schedule.
通过自动操纵,减轻了驾驶员的作业强度,加快了施工进度。
Also, this paper details the complex and high-speed logic control and timing schedule design.
对于系统中复杂且高速的逻辑控制及时序设计及其实现的阐述是论文的另一重要部分。
Also, this paper details the complex and high-speed logic control and timing schedule design.
对于系统中复杂且高速的逻辑控制及时序设计及其实现的阐述是论文的另一重要部分。
应用推荐