The roles down the side are Requirements (R), Design (D), Code (C), and Test (T).
在一边的任务是需求(Requirements,R)、设计(Design,D)、编码(Code,C)和测试(Test,T)。
The test current is forced through the test leads and the resistance (R) being measured.
我们迫使测试电流流过测试引线和被测电阻(R)。
Replaced R engine bleed air regulator, running-up test OK, pressure same.
更换右发引气调节器,试车正常,左右压力一致。
The test fluids were pure water and R-11.
实验工质使用了水和R - 11两种液体。
The test fluids were pure water and R-11.
实验工质使用了水和R - 11两种液体。
应用推荐