Similarly, we can be fairly confident that project 2 has a unique IRR of 80.1 percent.
同样我们可以确信项目2有唯一的IRR为80.1%。
We start with the beginnings of a project structure (see Figure 2).
我们从一个项目结构来开始(如图2所示)。
The project should look like that shown in Figure 2.
这个项目看起来应该如图2所示。
The example shown in Figure 2 is typical for a project being driven top-down.
图2 中显示的例子是一个典型的自上而下驱动的项目。
You will get the project structure as shown Figure 2.
您将得到如图 2 所示的项目结构。
Figure 2 portrays the vacation plans at the start of our vacation project.
图2描绘了度假项目开始时的度假计划。
The project is broken up into 2 phases.
这个项目分为2个阶段。
Figure 2: Expected project progress profile.
图2:预期的项目进度概况。
Click Finish to see a new project that resembles Figure 2.
单击Finish可以看到类似于图2的一个新项目。
The GridApplication project contains the application-specific code we wrote in Part 2.
GridApplication项目包含了我们在本系列文章第二部分编写的特定于应用程序的代码。
A new Web project is created with the structures seen in Figure 2.
将随即创建具有图2中所示的结构的新web项目。
Figure 2 shows class Book from the sample project visualized on a diagram.
图2显示了来源于显象在一个图中的样本项目的分类Book。
But keep in mind that Rubinius is a project that is barely 2 years old.
但是我们需要记住Rubinius已经是一个2年的工程了。
Figure 2: the relationship of the full project to a micro-increment.
图2:全项目与微小增量之间的关系。
Table 2: Planned deliverables for Storebrand project
表2:Storebrand工程计划交付使用的条目
Figure 2 shows the directory structure of the Android project CreatingXML.
图2显示了Android项目CreatingXML的目录结构。
The dialog in Figure 2 is used to set the name for the Xcode project.
图2中的对话框用于设置Xcode项目的名称。
Figure 2: Assessing the scope of the project.
图2:估计项目的范围。
Follow the instructions in Part 2 to deploy and start your Business Events project.
按照第2部分中的说明部署和启动BusinessEvents项目。
Use the command line in Listing 2 to create a project named zero.
使用清单2中的命令行创建名为zero.httpd 的项目;
And indeed, at no point does the Fed project that core inflation will rise above 2%.
而事实上,美联储没有任何理由认为核心通胀增长会高于2%。
Your project structure should look like the one shown in Figure 2.
项目结构如图2所示。
This article series is based on a real on demand transformation project, Oneida-2.
本文章系列是以真实的随需应变转化项目,Oneida - 2为基础的。
Step 2. Create a detailed project plan.
第2步创建详细项目计划。
Figure 2: Project emphasis over time.
图2:随时间变化的工程重点。
Present situation; 2. Necessity of the project; 3. My suggestion.
现在的情况;2。必要性工程的;3。我的建议。
Statement of undertaking of the project unit (see Annex 2 for details).
项目单位承诺书(详见附件2)。
Figure 2 shows you the initial page of New Portal Project wizard.
图2向您展示了NewPortalProject向导的初始页面。
Your management says the project has to be done in 2 months.
你的经理说这个项目必须在2个月内完成。
Your management says the project has to be done in 2 months.
你的经理说这个项目必须在2个月内完成。
应用推荐