• The first problem is that ecologists do not all agree what "stability" means.

    第一问题生态学家们并不同意稳定”的含义

    youdao

  • Power System Voltage Stability is a challengeable problem .

    电力系统电压稳定性一个具有挑战性问题

    youdao

  • Stability of civil structure is an outstanding problem on the design of structure.

    土建结构(或构件)稳定结构设计的突出问题

    youdao

  • On the other hand, this is a prominent problem of enterprises and social stability.

    一方面,又是维护企业社会稳定遇到突出问题

    youdao

  • The stability is one primary problem of construction waste landfill site engineering.

    稳定性建筑垃圾填埋场工程主要问题之一

    youdao

  • We have to ask: coulda stability fund really solve this problem?

    我们不得不:一稳定基金解决这个问题吗?

    youdao

  • Hubei society stability is a most important problem during the important strategy opportunity period.

    湖北社会稳定重要战略机遇期中压倒一切问题

    youdao

  • The problem of stability on rock structure is one of particularly important objects in geo-engineering.

    岩石结构稳定性问题岩土工程实践中迫切需要解决重要课题之一

    youdao

  • Stability of the side of rock is a very important problem to this engineering.

    岩质边坡稳定问题工程十分突出的问题之一。

    youdao

  • Stability theory must be used as guidance for solving this problem.

    解决这个问题需要稳定性理论指导

    youdao

  • The key to the problem is to assure the stability of water ring.

    保证稳定性水环输送关键

    youdao

  • The graduation design topic for: the operation stability of power system analysis and calculation problem.

    本次毕业设计题目电力系统运行稳定性问题分析计算

    youdao

  • For a country, social stability is the most important problem.

    对于一个国家而言社会稳定始终重要问题

    youdao

  • Stability calculation is the key problem of the arch structure design.

    稳定性计算结构设计个关键课题

    youdao

  • And enhance the quality of employment, job-stability has become a problem worthy of study.

    提升就业质量就业稳定性就成为一个值得研究问题

    youdao

  • The problem of high slope stability is outstanding.

    瀑布沟尾水隧洞出口高边坡稳定性问题突出。

    youdao

  • Stability of excavation face is a key problem to shield tunnel construction technology.

    开挖面的稳定性盾构隧道施工技术关键

    youdao

  • Stability of excavation face is a key problem to shield tunnel construction technology.

    开挖面的稳定性盾构隧道施工技术关键

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定