In the paper, we take advantage of power grid construction project as the research object, to study the whole process cost management.
论文以电网建设工程项目为研究对象,对其全过程造价管理进行深入的研究和探讨。
The objective of the project activity is to provide electricity to the local power grid through the collection and recovery of landfill gas for power generation.
该名目运动的目标是通过收集、回收垃圾填埋气发电,为当地电网供给电力。
At present, a project based on wind power in large scale grid-connected is ongoing.
目前,基于风力发电的大规模并网发电项目正在实施中。
At present, a project based on wind power in large scale grid-connected is ongoing.
目前,基于风力发电的大规模并网发电项目正在实施中。
应用推荐