Why would we need to estimate story point cost?
为什么我们需要估算故事点成本?
A point estimate for the mean of the execution time is 102.570 milliseconds.
执行时间的平均估值点是102.570毫秒。
The estimate and choice of manufactory technology is the key point of product manufacture.
制造工艺的选择与评估是产品制造中的一项必不可少的环节。
The estimate and choice of manufactory technology is the key point of product manufacture.
制造工艺的选择与评估是产品制造中的一项必不可少的环节。
应用推荐