The starting point of a development project is the requirements analysis phase.
开发项目的起始点是需求分析阶段。
In this dissertation, a low phase noise millimeter wave point frequency source is studied.
本文研究设计了一个低相噪毫米波点频源。
Don then covered each phase of the project - point by point.
接下来唐一点一点地描述了项目的各个阶段。
Don then covered each phase of the project - point by point.
接下来唐一点一点地描述了项目的各个阶段。
应用推荐