• Modern backpacks spread the load over a wider area.

    新式背包把承重量分散在更大的面积上。

    《牛津词典》

  • The van has additional load space over the driver's cab.

    该货车在驾驶室上方有额外的载货空间。

    《柯林斯英汉双解大词典》

  • The carrier said its load factor climbed 1.3 points to 83.2 percent over a year earlier.

    该公司表示,载客率与去年同期相比上升了1.3个百分点,升至83.2%。

    youdao

  • Load, boom Angle, and other indicators over their full range, for any significant inaccuracies.

    由于任何明显的误差负荷、吊臂或其它指示仪超过其最大范围。

    youdao

  • With short circuit protection, over current protection, the load voltage protection protection and multiple protection.

    具有短路保护、过电流保护、过负载保护以及电压保护多重保护。

    youdao

  • Load balancing and fail over handling.

    负载平衡和故障转移处理。

    youdao

  • The request will travel over the internet, through the router to the Load Balancer.

    请求经由Internet 传输,通过路由器到达负载均衡器。

    youdao

  • Don't operate and spool under full load over one minute continuously.

    请勿操作和阀芯下满负荷连续超过一分钟。

    youdao

  • The couple quarreled over the price of a load of hay.

    夫妻俩个因为一担干草的价格争吵。

    youdao

  • These men have quarreled over the price of a load of hay.

    这帮人为了一车干草的价钱争吵不休。

    youdao

  • The truck's load was over the limit allowed on the bridge.

    这辆卡车的负载量超出桥的载重限制。

    youdao

  • Meet or over MIL-R-83725 standard. If used as load switch, please contact GTVAC.

    符合或超过MIL-R-83725标准。负载开关应用,请向工厂咨询。

    youdao

  • Wrong polarity protection, over charging protection, over discharging protection, over load, short circuit protection.

    错极性保护、过充保护、过放保护、过载保护、短路保护。

    youdao

  • Current discharge protection, over pressure protection, over temperature protection, over load fuse protection.

    漏电保护,超压保护,超温保护,过载熔断保护。

    youdao

  • The key of push-over analysis method is load pattern and target displacement.

    推倒分析中的关键是加载模式的选取和目标位移的求取。

    youdao

  • Use life: over 20000 times in full load.

    使用寿命︰满负载时大于2万次。

    youdao

  • I poured a whole load of cold water over someone's idea today.

    我今天对某人的提议泼了一大盆的冷水。

    youdao

  • I don't necessarily want to load another solution over an existing instance of VS.

    我并不希望加载在VS的现有实例另一种解决方案。

    youdao

  • Note:The over current protection should be tested at other load rating.

    短路保护测试是在其它额定负载时测试。

    youdao

  • Take a load off your feet and look over this treasurer's report with me.

    坐下来和我一起看看这份会计报告 …字面意思就是卸下负担,一般后边跟…

    youdao

  • Take a load off your feet and look over this treasurer's report with me.

    坐下来和我一起看看这份会计报告 …字面意思就是卸下负担,一般后边跟…

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定