Main equipments and operation schedule for producing tire cord steel in Shagang are described.
介绍了沙钢生产帘线钢的主要设备及工艺操作规程。
You should call and schedule a follow-up appointment within 2 weeks after your operation.
你应该在手术后两周内与医生联系安排术后随访。
Develop a staff work schedule considering the need for 24 - hour operation.
制订员工工作日程,需考虑24小时运作的需求。
I need to fit a fourth operation into his schedule.
我得在他的工作表上再加第四个手术。
Unable to retrieve the job's schedule (s). The operation is cancelled.
无法获取作业的计划。取消操作。
Production schedule takes a very important position in the operation management activities of enterprises.
生产计划在企业经营管理活动中具有非常重要的地位。
I need to fit a fourth operation into his schedule.
我得在他的日程表上再加上第四个手术。
I need to fit a fourth operation into his schedule.
我得在他的日程表上再加上第四个手术。
应用推荐