• Load disturbance test and AGC test were carried out during test operation.

    在试运期间进行负荷扰动试验电网AGC试验。

    youdao

  • The operation state of the generator under the great disturbance is analyzed in detail.

    本文发电机受到扰动运行状况进行了详细分析。

    youdao

  • The operation state of the generator under the great disturbance is analyzed in detail.

    本文发电机受到扰动运行状况进行了详细分析。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定