The first criterion is that the framework must be open source.
第一个标准是,框架必须是开源的。
The effect of open-phase running of transmission line on distance criterion is analyzed.
主要分析了电力系统输电线路非全相运行对线路保护装置中距离判据的影响。
The effect of open-phase running of transmission line on distance criterion is analyzed.
主要分析了电力系统输电线路非全相运行对线路保护装置中距离判据的影响。
应用推荐