Source Control Management (SCM) process guidelines.
源代码控制管理(SCM)流程指导原则。
The theory divides the management process into three steps: planning, control and improvement.
该理论将管理过程分为三个步骤:计划、控制和改进。
As we know the project trace and control are the essential process of project management.
第三,项目的跟踪与控制是项目管理的重要过程。
Process comprehensive management ability to control the whole design project.
具有整个设计项目全面统筹和管理能力;
The management and control of cost for a construction project are a dynamic process.
工程造价的控制与管理是一个动态的过程。
The whole process of production to ensure quality control, we uphold the excellent scientific management.
确保对生产全过程的质量控制,我们秉承优秀,科学管理。
The process actually helps in terms of security control and resource management.
这个过程实际上有助于在安全方面的控制和资源管理。
So in the project management process, we must strengthen the management and cost control.
所以在项目管理过程中,我们要加强对成本的管理与控制。
Library crisis management includes the dimensions of emergency treatment and process control.
图书馆危机管理包括应急处理和过程控制两个维度。
The project cost control and management is a dynamic process.
工程造价的控制与管理是一个动态的过程。
Process modeling is the base of process management and control.
过程模型是虚拟企业过程管理和控制的基础。
Workflow management is an important technology for business process control.
工作流管理是实现业务过程控制的重要技术。
The data management system has become one of the most important part of the process control system.
数据管理系统逐渐成为冷连轧过程控制中的重要组成部分。
The statistical process control (SPC) plays an important role in quality management and control.
统计过程控制(SPC)是实现质量管理与控制的重要组成内容。
Take the effective management of the whole process of the project cost control is the key.
采取有效的全过程工程造价的管理控制是关键。
Workflow management is a key technology for the business process management and control in PDM.
流程管理是PDM系统中实施业务过程管理与过程控制的一项关键技术。
L2, a process control level, performs the function of the data flow management.
L2过程控制级承担了信息流管理功能。
Furthermore in order to fulfil object above, information management demonstrate the harmony with process control.
项目的信息与沟通管理阐明了为了实现上述各项管理目标的过程控制而进行的协调。
The control and management of engineering cost is a dynamic process.
工程造价的控制与管理是一个动态的过程。
Cables are electrical professional in construction management process to one of the key control links.
电缆敷设是电气专业人员在施工管理过程中需要重点控制的环节之一。
The process of enterprise management is the process of transition and control.
企业的管理过程就是信息的流转和控制的过程。
At last, discuss the OEM management process designment and quality control questions.
最后对OEM管理流程设计和质量控制问题进行了论述。
Quality management and control is a very important in the manufacture process of aviation enterprise.
质量管理与控制工作是航空企业生产过程中的重要环节。
During the period of construction, it is essential not only the right sense of quality but also the management with scientific control technology in the whole process.
施工期间,除了要树立正确的质量意识外,还要应用科学的控制技术对施工全过程进行管理。
Outstanding quality management, optimizing control process.
突出质量管理,优化控制流程。
The application of automatic agriculture management control system in the sugar manufacturing process was introduced.
介绍农务管理自动化系统在甘蔗制糖生产中的应用实践。
Minimum 5 years experience in production management engineering process control.
至少有五年生产治理、工程和工艺控制的工作经验。
Minimum 5 years experience in production management engineering process control.
至少有五年生产治理、工程和工艺控制的工作经验。
应用推荐