Fokker will deliver 43 sets during the planned low rate initial production (LRIP) phase.
在低速率初始生产(LRIP)阶段,Fokker将交付43套设备。
At the opposite end of the design program, the last event is initial production which may be pilot production or the beginning of routine production.
在设计程序的另一端,最后的程序是初期生产,可能是试生产或者日常生产的开始。
At the opposite end of the design program, the last event is initial production which may be pilot production or the beginning of routine production.
在设计程序的另一端,最后的程序是初期生产,可能是试生产或者日常生产的开始。
应用推荐