Chapter Five is the implementation and control of the competition strategy.
第五章是竞争战略的实施与控制。
Plan, implementation, control, revise design and development.
制订,执行、管制、修正设计开发计划。
Third, the axis and small car coordination and control strategy design and implementation.
三是主轴及小车协调控制策略设计与实现。
In the production process, the implementation of rigorous and comprehensive quality control.
在产品的生产过程中,实行严格全面的质量控制。
Implementation schedule and control plan.
实施进度管制计画。
Implementation schedule and control plan.
实施进度管制计画。
应用推荐