• The head load time is: 35ms.

    磁头加载时间35毫秒

    youdao

  • Therefore, it is fit for a small hydro power station with low head and load.

    机型适用水头负荷变化比较大的水电站。

    youdao

  • Then, the effect of pile head vertical load value on negative skin friction is analyzed.

    荷载大小影响进行了研究

    youdao

  • The load of the cutter head is the basic basis for structure design and performance analysis.

    盘所受载荷刀盘结构设计及其性能分析基本依据

    youdao

  • The load of the cutter head is the basic basis for structure design and performance analysis.

    盘所受载荷刀盘结构设计及其性能分析基本依据

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定