Is the ideal work high above the ground construction equipment.
是理想的高空作业建筑设备。
Ground construction for foods, chemical, electronic, medical and repair plant, etc. dig sales courts.
食品、化学、电子、医药、修护厂、大卖场等,地板面床材结构。
In underground construction, we often use artificially ground freezing method to control soft earth recently.
在地下工程施工中,为强化软弱地层,近年来常采用冻结施工法。
Piles Dry Jet Mixing Method is a kind of dry construction of ground treatment technology.
粉喷桩是搅拌桩采用干法施工的一种地基处理技术。
Construction company needs a man to dig holes - Ground level position available.
建筑公司要招一个人挖坑——初级位置空缺。
For digging holes of construction ground work, chasm digging and mud, sand. Coal. gravel loading.
建筑地基的基坑挖掘、深坑挖掘及泥、沙、煤、碎石的装载。
The CFG pile first time applies in this city high-rise construction ground treatment.
CFG桩第一次应用于该市高层建筑的地基处理。
There are many ways to control the ground subsidence during mini shield construction process.
微型盾构在施工过程中控制地面沉降的方法很多。
The effect of ground motion noise on the network construction is analyzed.
指出了地动噪声分析对台网建设的作用。
Thunderstorm season construction, high above the ground to prevent lightning strikes.
雷雨季节施工,高空作业要防雷击。
The ground foundation treatment is the key of the construction of the highway roadbed.
地基处理是公路路基施工的关键。
The ground station of satellite communication, a state key project, is also under construction.
国家重点项目,卫星地面接收站也在建设中。
Ground fissure is the main geological disaster in Xi an city construction.
地裂缝是西安市主要的工程地质灾害问题。
Construction company needs a man to dig holes — Ground level position available.
建筑公司要招一个人挖坑——初级(地面)位置空缺。
After an hour's drive, traffic ground to a halt again - road construction this time.
开了一个小时,车流又停住不动了,这次是因为前方在修路。
But, there is also common ground between them, to control the proposed construction project cost.
但是,它们之间也存在着共同点,旨在控制拟建工程费用。
Building Materials Prices; Construction Contract; Legal Ground.
建材价格;施工合同;法律依据。
The construction of underground railways has eased traffic pressure on the ground.
地下铁道的修建减轻了地面交通的压力。
The new construction has gotten off the ground with a ten-million-dollar donation.
以这一千万的捐款,新工程可以取得进展。
Ground fissure is the main geological disaster in Xi 'an city construction.
地裂缝是西安市主要的工程地质灾害问题。
Ground fissure is the main geological disaster in Xi 'an city construction.
地裂缝是西安市主要的工程地质灾害问题。
应用推荐