Based on the analysis of the project cost theory put forward some problems and solutions.
本文在分析项目工程造价理论的基础上提出几点理由以及解决方案。
Finally, it puts forward some Suggestions for controlling transaction cost.
最后提出控制交易成本的建议。
According to the relation between cost and benefit, put forward the pollution control method.
根据成本与效益的关系,提出污染控制方法。
VAR model on maintenance cost is put forward according to the theory of simplification.
依据约化理论,建立了维修费用的VAR模型。
So the cost of the project, progress, control of resources has put forward higher requirements.
这样对项目的成本、进度、资源控制提出了更高的要求。
Technology and method of effectively controlling engineering cost are put forward through all construction process.
提出工程建设全过程中,有效制约工程造价的技术和策略。
And put forward the feasibility of the project management framework of cost management based on.
并提出了基于成本管理的项目管理框架的可行性。
Cool! Looking forward to more styles Any ideas on how much it would cost?
太好了,期待更多式样,价格确定了吗?
Part three has put forward the amalgamation of ABC and Standard Cost methods.
第二部分,对标准成本法与作业成本法融合的论述。
Part three has put forward the amalgamation of ABC and Standard Cost methods.
第二部分,对标准成本法与作业成本法融合的论述。
应用推荐