Accept the comprehensive assessment by company. (Failure would lead to stoping the operation).
接受公司综合评估(不合格终止运作)。
Finally, a probabilistic risk assessment method for cascading failure of power system was introduced.
最后提出了一种电力系统连锁故障风险评估方法。
Finally, a probabilistic risk assessment method for cascading failure of power system was introduced.
最后提出了一种电力系统连锁故障风险评估方法。
应用推荐