A rough cost estimate for a solution.
对解决方案的粗略成本估算。
Unfortunately, there's no estimate for that question.
很不幸,我们还没有这样的估算结果。
Then enter the estimate for each task, one after the other.
然后对每一项任务输入估计,一个接一个。
How much disk space do I need to estimate for my database server?
对于我的数据库服务器,我需要估算多少硬盘空间呢?
A point estimate for the mean of the execution time is 102.570 milliseconds.
执行时间的平均估值点是102.570毫秒。
Did the engineer estimate for the repair of the bridge?
那位工程师估计修桥的费用了吗?
'What's the top-down estimate for the entire cost of the project?'
那么这一整套估算下来,这项目所需总费用得多少?
'What's the top-down estimate for the entire cost of the project?'
那么这一整套估算下来,这项目所需总费用得多少?
应用推荐