A standard element flow diagram of a manufacturing process was launched.
提出了生产流程的基准元素流图。
The flow of events, or workflow, is a key element of a business use case.
事件流、或者工作流程流,是业务用例的一个关键要素。
That means organizing most every element to allow as smooth a work flow as possible.
这意味着你要把每一个元素,都尽可能的组织成一个顺畅的工作流程。
Control only needs to flow once from a source element to a target element.
从源元素到目标元素,控制只需要流动一次。
Link the Flow configuration element with the View state using a transition.
使用一个transition来将Flow配置元素与Viewstate联系起来。
This flow is subject to an element with the "clear" property.
这种排列取决于元素的“clear”属性。
Press the plus ("+") sign on the Flow configuration element
点击Flowconfigurationelement上的加号(“+”)
Similarly, don't take an element off the flow if you can avoid it.
同样的,如果可以的话,请不要让元素脱离文档流。
Boundary element method is the most widely used method for potential flow.
势流问题大量采用边界元方法数值求解。
Boundary element method is the most widely used method for potential flow.
势流问题大量采用边界元方法数值求解。
应用推荐