• Don't switch on during drilling operation.

    钻井作业期间不能合闸。

    youdao

  • If the initial workpiece is solid, a drilling operation must be performed first.

    如果初始工件是实心的,则必须首先进行钻孔作业。

    youdao

  • Also in development are new drilling muds that cool the drill bit during operation.

    新的钻探泥浆(用于在操作时冷却钻头)也在开发中。

    youdao

  • Drilling there would be strictly a wildcat operation.

    在那里钻井绝对是一次盲目的行动。

    youdao

  • The drilling equipment and operation platform are described.

    介绍了施工设备及施工平台。

    youdao

  • The drilling equipment and operation platform are described.

    介绍了施工设备及施工平台。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定