The drafting committee worked through the night in a vain attempt to finish on schedule.
起草委员会徒劳地通宵工作想按期完成工作。
Drafting a work breakdown structure (WBS) as the basis for a project schedule.
草拟以项目计划为基础的工作故障结构(WBS)。
Drafting a work breakdown structure (WBS) as the basis for a project schedule.
草拟以项目计划为基础的工作故障结构(WBS)。
应用推荐