Design Consultant will consult with the executive architect or general contractor to develop cost estimation.
设计顾问将就成本估算的编制与总建筑师或总承包人进行商讨。
The above design procedure is suitable for those applications sensitive to cost.
因此非常适合于对成本敏感的系统设计。
Design cost control is the key to project cost control and focus.
设计阶段的成本控制是工程项目成本控制的关键与重点。
Hanging a signature design on a project is sure to raise the overall cost.
挂上签名设计肯定要增加一个项目的总体费用。
If you want to network design art, and that this cost is another matter.
如果你要请网络设计美工,那这费用就另当别论了。
Abstract: the design stage is the key stage to control construction project cost.
[摘要]设计阶段是建设工程造价控制的关键阶段。
The whole design scenario is compact, low cost and convenient to use.
整个系统设计方案简洁、设计成本低廉、使用方便。
In this research we are trying to design low cost, convenient and cabinet ECG.
制作价格低廉、使用方便并且方便携带的心电仪是本课题的研究意义所在。
In this research we are trying to design low cost, convenient and cabinet ECG.
制作价格低廉、使用方便并且方便携带的心电仪是本课题的研究意义所在。
应用推荐