The aforementioned prize and design cost shall include tax.
以上奖金和设计成本费均含税。
Prize and design cost shall be paid within 60 days after the review.
奖金及设计成本费在评审结果后60日内一次性支付。
The design cost is actually a cost that has the meaning of decision-making.
设计成本是具有决策性的成本。
Design cost control is the key to project cost control and focus.
设计阶段的成本控制是工程项目成本控制的关键与重点。
This article has made some research work in the confirmation of product level, the way of design, cost control and construction management.
本文就装修住宅的产品定位、产品设计方法、成本控制、施工管理等方面的问题进行了研究和探讨。
This article has made some research work in the confirmation of product level, the way of design, cost control and construction management.
本文就装修住宅的产品定位、产品设计方法、成本控制、施工管理等方面的问题进行了研究和探讨。
应用推荐