The converged project duration together the crew size used is shown in Table 3.
融合项目期限连同船员尺寸是采用表3所示。
Determine size of inspector crew needed per production lot size and urgency.
根据待检验产品数量与紧急程度确定检验团队的大小与成员。
Determine size of inspector crew needed per production lot size and urgency.
根据待检验产品数量与紧急程度确定检验团队的大小与成员。
应用推荐