The segment was then cast as usual, and the core rod extracted after 1.5 hours.
分部,当时投下往常一样,和核心棒后提取1.5小时。
Control rod worths and other operation safety parameters of core are acceptable.
各堆芯方案的控制棒价值等运行安全有关参数都可以接受。
Control rod worths and other operation safety parameters of core are acceptable.
各堆芯方案的控制棒价值等运行安全有关参数都可以接受。
应用推荐