Propose the effective way of controlling the cost of construction project from the construct stage to the very end of the project.
提出建设项目从施工阶段到竣工阶段,其造价控制的有效途径和方法。
The management of controlling factors will directly affect the overall quality of construction projects.
对于控制因素的管理,将直接影响到建筑工程的总体质量。
This article introduces measures of controlling projects cost during the construction.
介绍了工程项目建设过程中项目施工成本控制的措施。
Second, controlling the progress effectively and timely during the construction.
第二,在施工过程中对进度进行及时有效的控制。
The construction phase of the construction cost control, focus on cost controlling.
建筑工程施工阶段的造价控制,重点在于成本的控制。
At last, proposed detail standard of construction and quality controlling.
最后,对碎石化的施工工艺和质量控制提出了具体要求。
The new pricing mode suggests new idea and method for controlling construction cost to owners.
新的计价模式给业主的工程造价控制思想及方法提出了新的要求。
Difficult point of organizing construction project and controlling construction stage are discussed.
论述了工程组织的难点,工程各项目实施阶段的控制。
Schedule controlling has an important effect on increasing economical benefit of construction project.
工程建设进度控制对提高工程项目的经济效益有重要影响。
Some measures should be taken in controlling tax cost:enforcing the legal construction of taxation;
控制税收成本应采取以下措施:加强税收法制建设;
Technology and method of effectively controlling engineering cost are put forward through all construction process.
提出工程建设全过程中,有效制约工程造价的技术和策略。
The suggested controlling condition is for the normal design and construction membrane structure.
建议的膜结构积水控制条件是对正常设计、施工的膜结构而言的。
The suggested controlling condition is for the normal design and construction membrane structure.
建议的膜结构积水控制条件是对正常设计、施工的膜结构而言的。