• Load RJCBRT.DLL with its absolute path prior to the first reference to a bridge.

    在第一次引用桥之前,用绝对路径加载rjcbrt . dll。

    youdao

  • The bridge was designed to bear the heaviest load any train could carry.

    这座桥的设计能力可承受火车能载运的最重负荷。

    youdao

  • The design load is the important technical criteria on road and bridge design.

    公路桥梁设计荷载是公路与桥梁设计的重要技术指标。

    youdao

  • The truck's load was over the limit allowed on the bridge.

    这辆卡车的负载量超出桥的载重限制。

    youdao

  • Wind load has been one of the control loads in the design of modern bridge.

    这使风对桥梁的作用愈加明显,风荷载已经成为现代桥梁设计的控制荷载之一。

    youdao

  • The bridge has been built to support very heavy load.

    建这座桥是为了使重载车也能经过。

    youdao

  • Most of the load is transfer to the tower of the bridge.

    斜拉桥桥跨结构的重量和桥上活载绝大部分或全部通过斜拉索传递到索塔上。

    youdao

  • Load test of bridge is a mean that can verify the bridge structure design theory.

    本文中的竣工试验就是我们通常所说的桥梁荷载试验。

    youdao

  • Suitable for all resistance strain gauge load cell in bridge type.

    适用于所有电阻应变桥式称重传感器。

    youdao

  • Cabled-stayed bridge is a kind of bridge with long history and cable load-carrying structure.

    斜拉桥是一种古老而又年轻的缆索承重结构。

    youdao

  • Cabled-stayed bridge is a kind of bridge with long history and cable load-carrying structure.

    斜拉桥是一种古老而又年轻的缆索承重结构。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定