The site test on the prestressed frame beam was introduced.
介绍了现场进行的预应力框架梁测试。
内中环梁现浇明矾。
Failure stage. The wall was equaled to a beam-hinged frame.
破坏阶段——将墙体视为肋梁严重破损的梁铰框架模型。
Tie beam is an important element in frame-shear wall structure.
连梁在框架-剪力墙结构中,也是很重要的一个构件。
The middle frame is directly connected with a lower moving beam of the press.
中框直接与压机下活动梁连接。
The middle frame is directly connected with a lower moving beam of the press.
中框直接与压机下活动梁连接。
应用推荐