The second possible application is directly based on the crossing points of the Golden Mean.
第二种:直接参照图示的四个“黄金分割”点。
All the advice based on both these theories completely overlook two very important points.
所有建立在这两个理论上的建议都完全忽视了一个重要因素。
Order your notes and group together points based on your original plan.
根据你之前的计划整理你的笔记,将观点放在一起。
The Quantitative Analysis of Project Objective Flexible Control Based on Double Base Points;
建设工程项目目标的控制是贯穿项目的整个建设过程。
The Quantitative Analysis of Project Objective Flexible Control Based on Double Base Points;
建设工程项目目标的控制是贯穿项目的整个建设过程。
应用推荐