The Quantitative Analysis of Project Objective Flexible Control Based on Double Base Points;
建设工程项目目标的控制是贯穿项目的整个建设过程。
To address this shortcoming, extension points are identified in the base method.
为克服此缺点,在基本方法中标识了扩展点。
To address this shortcoming, extension points are identified in the base method.
为克服此缺点,在基本方法中标识了扩展点。
应用推荐