The optimization adjustment strategy of project schedule.
项目进度优化调整策略。
On the basis of this, design foreign trade feeder line adjustment strategy for GCT.
在这基础上设计出广州集装箱码头有限公司的外贸支线业务策略调整方案。
On the basis of this, design foreign trade feeder line adjustment strategy for GCT.
在这基础上设计出广州集装箱码头有限公司的外贸支线业务策略调整方案。
应用推荐